Locating a data centre or industrial facility can no longer be reduced to choosing a plot of land. Available power, connection lead time, cooling, water, electricity price, permitting and expansion capacity jointly determine viability.
A battery can serve peak shaving, backup, arbitrage, grid services or a constrained connection. These uses interact. Aggressive cycling may accelerate degradation, while a large security reserve reduces capacity available to the market.
Aura structures the decision around possible sites and architectures. Each option combines grid connection, local generation, PPA, storage, backup and cooling. Financial indicators sit alongside availability, resilience, carbon, schedule and reversibility.
The engine then identifies blockers. A site may be rejected because of an excessive grid delay despite attractive land economics. A battery may become viable if a capacity contract is secured or avoided connection capacity crosses a defined threshold.
The output provides a preliminary architecture, critical assumptions, studies to launch, contractual requirements and precise go/no-go conditions. It prepares the investment decision while reducing the risk of detailed engineering.