Earth seen from space, criss-crossed by light lines linking cities

NPV, IRR and DSCR are essential to energy investment analysis, but they do not decide the case. Two projects with similar returns may carry radically different exposure to grid connection, degradation, availability, counterparties or regulation.

The first step is to make assumptions visible: CAPEX, OPEX, lifetime, debt, prices, revenues, cycles, efficiency and terminal value. Each assumption needs a source, unit and date and, where uncertainty is material, a range rather than artificial precision.

Aura turns financial outputs into decision facts and combines them with technical and strategic objectives. A DSCR, business-continuity or connection-date constraint can eliminate an option even when its IRR is higher. Non-compensation protects decision-makers from attractive but misleading averages.

Scenarios are central: low prices, base case, high volatility, congestion or connection delay. The goal is not to predict the future perfectly, but to select an option that remains acceptable across several credible futures.

Backward then calculates the commercial and contractual conditions required: maximum CAPEX, revenue floor, technical guarantee, debt level or deadline. The investment becomes negotiable and manageable instead of being reduced to one rate of return.